Click on the following projects for an overview of our skills and services :

Jacobs – Glasgow University
Acergy – Polar Queen
Freyssinet – Forth Road Bridge
Edinburgh Council – Cables Wynd, Edinburgh
Scottish & Southern Energy – Lednock Dam
Hertel – Hound Point BP Forties Pipeline System Oil Terminal, Firth of Forth
Soil Mechanics - Waverly Rail Project
BEAR Scotland - M90 Junction 10
Scottish & Southern Electric - Inverawe Power Station
Fife Council - Guardbridge
DSM Dalry – Tank Inspections
BEAR Network Inspection
BEAR Scotland - A92 Newport on Tay
Return to main project page
Location - Dalry

Client -DSM

An inspection was undertaken of 2 tanks at the DSM chemical plant in North Ayrshire. These were concrete bio-reactors which has previously been lined to reduce the risk of leaks form the tank. The inspection focused on the condition of this lining.
The inspection team entered the tank using confined space procedures and surface supply breathing apparatus. CAN Scotland provide an experienced and competent team of fully qualified personnel for this type of access.
Utilising rope access techniques in this way allowed a safe access method to visually inspect the tank liner. The client was provided with a report containing both photographic and video evidence. AutoCAD drawings were produced of the tank and inspection locations.

 